Logistics

You see every unit on the road.
You act before the delay.

Nuvnext reads telemetry, traffic and weather across your whole fleet, decides which route is about to fail and gets the relief unit and the notice ready.

320
active routes
9
corridors
2
won't make their window
11:30
Tuesday
Your fleet across the country · 11:30

Illustrative case. The figures, times and names are examples.

11:30 · Tuesday

320 routes on 9 corridors. Two won't make their window.

  • Units on the road320Samsara and Geotab · position every 30 s
  • Delivery windows today412SAP · orders of the day
  • Routes at risk2One is route 207, leaving for Querétaro

Scroll to see how it spots the problem, what it decides and what it leaves ready for you to sign.

10:50

Route 207 stopped on the way out to Querétaro.

  • Unit 207, stopped22 minSamsara · km 46, Tepotzotlán
  • Wait in the yard before leaving40 minGeotab · Cuautitlán yard
  • Queue on the Mexico City–Querétaro highway9 kmGoogle Cloud · live traffic
  • Heavy rain on the stretch18 mm/hGoogle Cloud · weather on the route
  • Order 4410, El Marqués Plant13:00SAP · committed window

Arrives 13:42.42 minutes outside its window. The customer doesn't know yet.

11:10

Relief with unit 118, which is already in Querétaro.

  • Unit 118, at the Querétaro DCfreeSamsara · unloaded at 10:35
  • Same assortment as order 441024 palletsOracle · DC inventory
  • Distance to El Marqués Plant18 kmGoogle Cloud · route without rain
  • Unit 207 returns its loadCuautitlánStays for tomorrow's route

Arrives 12:40.Twenty minutes before the window. It ruled out two other units: one without the assortment and one more than two hours away.

11:30

The relief and the notice are ready. Only your signature is missing.

For Receiving, El Marqués Plant · by emailYour order 4410 arrives today at 12:40 with unit 118. The original unit stopped because of traffic and rain on the way out of Mexico City.
For the driver of unit 118 · departure orderLeave the Querétaro DC at 11:45 with order 4410. Deliver at dock 2.
Nothing goes out without your approval.
On Monday

318 of 320 routes made their window.

  • Cuautitlán yard, average wait40 min3 of the last 7 days, always on departures before 08:00
  • Route 212, late load75 minLeft late because of loading; the notice went out at 09:05
  • On-time deliveries, week99%Target 95%

Move the departure of unit 207 to 07:30.The proposal waits in your inbox. Every decision you sign sharpens the next one.

With what you already use

It reads your fleet's systems. It doesn't replace them.

  • Fleet telemetry and GPS
  • GeotabStops, times and driving
  • SAPOrders and committed windows
  • OracleTransportation and cost per shipment
  • Google CloudRoutes, traffic and weather on the route

Your fleet shouldn't find out about the delay from the customer.